Filter by Content Type
Filter by Content Type HM
Showing 10 of
108 results

TERNA

  • Capacity Demand Curve Development in cooperation with The Brattle Group (2012)

Tennessee Valley Authority (TVA)

  • Economic and LOLE Based Reserve Margin Studies (2009, 2011, 2013, 2015, and 2017)
  • Seasonal Reserve Margin Studies (2020)
  • Interruptible Contract Evaluation that Examined both Economics and Physical Reliability Metrics (2010)
  • Renewable Integration Study (2016 and 2018)
  • IRP Renewable Integration Study (2019)
  • Intra-hour Flexibility Studies (2021)
  • Reserve Margin and ELCC Study (2024)

Southwest Power Pool (SPP)

Southern Company

  • Economic and LOLE Based Reserve Margin Study (2007, 2010, 2013)
  • Interruptible Contract Evaluation. Examined both Economics and Physical Reliability Metrics
  • Various Other Resource Adequacy Assessments and Production Cost Studies, including fuel availability studies
  •  IRP Renewable Integration Study (2022)

SMUD

  • 2023 Slice of Day Analysis

Single Buyer Department (A ring-fenced entity within Tenaga Nasional Berhad)

  • Generation Reliability Standard Study for Peninsular Malaysia and Sabah (2016)

SCE/SDGE

  • ELCC study in 2017

Sarawak Energy

  • Resource Adequacy Assessment (2018)

Sabah Electricity

  • Generation Reliability Standard Study for Peninsular Malaysia and Sabah (2016)
  • Generation Reliability Standard Study (2017)
PowerGEM UGM registration closes 9/15

Search